Project Gallery
Project:
Recharge Well Installation for LTA Contract 903
Construction of Bugis MRT Station & Associated Tunnels for Downtown Line Stage 1.
 
 
GIE was engaged by Soletanche Bachy - Koh Brothers Joint Venture for the sub contract scope of supplying and installing approximately 100 recharge wells for LTA Contract 903. 

This involved the use of Casagrande C6 drilling rigs to bore 200mm diameter wells upto 40m or more, to install the recharge wells, in close co-ordination with on-going diaphragm walling and adjacent property owners.
 
   
   
   

 

Project: 
LTA Contract C921 DTL Stage 2 
Installation of 300mm diameter micropiles with permanent casing.
 
 
GIE was engaged by Kori Construction and Ssang Yong Engineering & Construction Joint Venture for the sub contract scope of Installation of 300mm diameter micropiles with permanent casing for Temporary Traffic Decking over Rochor Canal for
 